Specification

Shop Specifications and Common Facilities at Wave 1st Silver Tower
Office Space Specifications and Common Facilities at Wave 1st Silver Tower
Air Conditioning
  • 100% air-conditioning for the shop(s)
  • Chilled water pipe line up to shop level for central air-conditioning plant hook up
Main Power
  • Main supply from UPSEB
  • 100% captive standby power supply
Water
  • Potable water supply to Restaurant(s) and at common areas on chargeable basis
  • Overhead storage tanks
  • Water treatment / filtration system
  • Potable drinking water supply at single point one each floor for Allottee(s) / Occupier(s)
Fire Fighting
  • Sprinkler system
  • Hydrants with hose real
  • Smoke detectors connected to central fire panel
Lighting System
  • All public areas shall be well lit with energy efficient fixtures
Public Address System
  • For announcement (s) / paging at / near the information center
Structure
  • RCC column and slab with brick work masonry
Flooring
  • Entrance lobby will be in suitable tile flooring
  • Corridor at shopping level will be in suitable tile flooring
Piped Music
  • Piped music at shopping floor / common areas
Other common facilities
  • Well laid out toilets with automatic flush valve
Telephone / Lines
  • 2 pair telephone line point upto each shop
Exterior finish of the building
  • Curtain wall plaster / paint finish
Shop Front
  • Aluminum framed glazing with one door at the front of each shop.
Air Conditioning
  • Air-conditioning will not be provided in common areas
  • Spilt air-conditioning will be provided inside the unit.
Main Power
  • Main supply from UPSEB
  • 100% captive standby power supply as per chart
Water
  • Water supply in each unit on chargeable basis
  • Overhead storage tanks
Fire Fighting
  • Sprinkler system
  • Hydrants with hose real
  • Smoke detectors connected to central fire panel
Lighting System
  • All public areas shall be well lit with energy efficient fixtures
Structure
  • RCC column and slab with brick work masonry
Flooring
  • Entrance lobby will be in suitable tile flooring
  • Corridor at Office Space level will be in suitable tile flooring
Piped Music
  • Piped music at Office Space floor / common areas
Other common facilities
  • Well laid out toilets with automatic flush valve
Telephone / Lines
  • 2 pair telephone line point upto each Office Space
Exterior finish of the building
  • Curtain wall plaster / paint finish
Office Front Space
  • Aluminum framed glazing with one door at the front of each Office Space.